Section 1.0 - General Description of Services:
Perfect Test House shall provide engineering services, maintenance assessment services and safety evaluation services for sites. These services shall be performed in accordance with the prescribed set of standards and criteria as described in Sections 2 through 5 of this Scope of Work. This section also specifies the required format for site reports.
Perfect Test House shall participate in the following project meetings:
Part 1.1 Project Conference Calls
Part 1.2 Site Assessment Kickoff Meeting
Part 1.3 Site Closing Meeting
Section 2.0 – Engineering Services
Perfect Test House shall provide the following Engineering Services for all Ammonia refrigeration systems on a respective Site
Part 2.1 Calculation of Ammonia Inventory
Part 2.2 Evaluation of Technical Information
Part 2.3 Future Engineering Services
Section 3 - Planned Maintenance Evaluatio.
Perfect Test House shall evaluate the existing site Planned Maintenance (PM) program for ammonia refrigeration assets against the criteria in Checklist. The site must provide documented evidence of each component PM in order to be credited.
Section 4 – Independent Mechanical Integrity (MI) Validation.
Perfect Test House shall perform a mechanical integrity validation in accordance with referenced Standard Maintenance Procedures including non-destructive testing (NDT) using non destructive measurements. Perfect Test House shall submit specific tests for performing the assessment. Perfect Test House shall perform this work within 10 working days of initial assessment.Priorities shall be set based on initial visual assessments.
Part 4.1 Piping System Assessment
Part 4.2 Vessel and HEX Assessment
Section 5 – Ammonia Refrigeration System Safety Evaluation
Perfect Test House shall perform a Safety Evaluation of each refrigeration system on site. For effort efficiency, be completed in conjunction with Section 4 Mechanical Integrity validation. Deficiencies shall be identified.
Section 6 – Project Documentation and Site Assessment Reports
Perfect Test House shall insure that the quotation, all correspondence, documentation and final reports are submitted in accordance with the following criteria:
Part 6.1 Project Schedule
Parts 6.2 Site Assessment Report
ADDITIONALLY:-
AMMONIA PPM WILL BE MEASURED IN ALL AREAS HAVING AMMONIA REFREGRATION SYSTEMS
VALUES WILL BE REPORTED ALONG WITH ALARMS IF ANY